CS1016 - SOFTWARE TESTING Questions Bank 2014

Anna University, Chennai

Anna_University,_Chennai_logo

SRINIVASAN ENGINEERING COLLEGE PERAMBALUR – 621212

DEPARTMENT OF INFORMATION TECHNOLOGY CS1016 - SOFTWARE TESTING

PART –B (16 MARKS)

UNIT- I TESTING BASICS

1. Explain The Role of process in Software quality. (16)

2. Explain Testing as a Process. (16)

3. Overview of the Testing Maturity Model (TMM) & the test related activities that

Should be done for V-model architecture. (16)

4. Explain Software Testing Principles. (16)

5. Explain Origins of defects. (16)

6. Explain Defect Classes, Defect Repository, and Test Design. (16)

7. Explain Defect Examples: The Coin Problem. (16)

8. Explain the tester’s role in a Software Development Organization. (16)

9. Explain Developer / Tester support for developing a defect repository. (16)


PART –B (16 MARKS)

UNIT- II TESTCASE DESIGN

1. Explain in detail about the Smart Tester. (16)

2. Explain in Test case design strategies. (16)

3. Explain the Types of black box testing. (16)

4. Explain Other Black box test design Approaches. (16)

5. Explain Black Box Testing and COTS (Commercial Off-the-shelf) components.(16)

6. Explain Types of white box testing. (16)

7. Explain Additional white box test design approaches. (16)

8. Evaluating Test adequacy Criteria. (16)


PART –B (16 MARKS)

UNIT- III LEVELS OF TESTING

1. Explain the Need for levels testing. (16)

2. Explain Levels of testing and software development paradigm. (16)

3. Explain Unit Test. (16)

4. Explain Unit Test Planning. (16)

5. Explain the class as testable unit. (16)

6. Explain in detail about the Test harness. (16)

7. Explain Integration Test. (16)

8. Explain System test: Different Types. (16)


PART –B (16 MARKS)

UNIT- IV

TEST MANAGEMENT

1. Explain Testing and Debugging goals and Policy. (16)

2. Explain Test planning. (16)

3. Explain Test Plan Components. (16)

4. Explain Test Plan Attachments. (16)

5. Explain Reporting Test Results. (16)

6. Explain the role of the 3 critical groups. (16)


PART –B (16 MARKS)

UNIT- V CONTROLLING AND MONITORING

1. Explain Measurements and milestones for monitoring and controlling. (16)

2. Explain Criteria for test completion. (16)

3. Explain Software configuration management. (16)

4. Explain in detail about the Types of reviews. (16)

5. Explain in Components of review plans. (16)

No comments:

Post a Comment